Rooftop solar for your home, with the subsidy handled.

A system sized to your bill, with the PM Surya Ghar assistance applied for by us.

Illustrative image, not a Leo installation.

Your number, home.

Home

Your monthly electricity bill
Rs 800Rs 25,000

Your estimate

Monthly saving, about

Rs 2,100per month

System size

2.5 kWp

Payback

2 to 3 years

Cost after subsidy

Rs 41,300 to 71,900

Kept over 25 years, about Rs 6.2 lakh, before tariff rises.

Replies during office hours. Estimates only, not a quotation.

How we got this, and your own tariff

How we got this. Tariff Rs 7.70 per unit (LT-I(B)(ii) domestic, 201 to 300 units a month, Telangana), 4 units per kWp per day (1,460 a year, a normal south Indian rooftop yield), 85 sq ft of roof per kWp. Benchmark cost Rs 50,000 per kW for the first 2 kW and Rs 45,000 after (MNRE, 13 Feb 2024), with a band of 0.9x to 1.15x. PM Surya Ghar assistance Rs 30,000 per kW for the first 2 kW and Rs 18,000 for the third, capped at Rs 78,000 (MNRE guideline, 7 Jun 2024). Tariff from the TGERC retail supply tariff order FY 2025-26, checked 5 Sep 2026. Daytime use assumed at 90%. This is an estimate; the number that matters comes from a roof survey, in writing.

PM Surya Ghar

The assistance, by system size

What PM Surya Ghar pays against a home system of one, two or three kilowatts, set beside the ministry's benchmark cost. From three kilowatts the assistance stays at Rs 78,000.

  • 1 kWp

    Assistance
    Rs 30,000
    Benchmark cost
    Rs 50,000
    Cost after assistance
    Rs 20,000
  • 2 kWp

    Assistance
    Rs 60,000
    Benchmark cost
    Rs 1,00,000
    Cost after assistance
    Rs 40,000
  • 3 kWp

    Assistance
    Rs 78,000
    Benchmark cost
    Rs 1,45,000
    Cost after assistance
    Rs 67,000

Figures as of 5 Sep 2026. Assistance from the MNRE operational guideline for PM Surya Ghar, 7 Jun 2024; benchmark cost from the MNRE benchmark for general category states, in force from 13 Feb 2024.

Cost after assistance is the benchmark cost less the assistance. An installed price sits in a band around the benchmark; your estimate above prints that band.

What we need from you

  • Your electricity account: the consumer number on a recent bill
  • Identity and ownership documents for the house
  • The bank account the assistance is paid into
  • Roof access on survey day

What Leo handles

  • The survey: roof, structure, shade and the supply
  • The design and the written proposal
  • The applications on the national portal and to the DISCOM
  • The installation, to the written proposal
  • The net-meter inspection request
  • The commissioning report and the assistance claim

Net metering

Who files what with the utility

Six steps with the DISCOM, from the application to the assistance, each marked with who does it.

  1. Application on the national portal and to the DISCOM

    Your electricity account, identity and ownership documents, and the bank account the assistance is paid into. Prepared by us, signed by you.

    Leo files
  2. Feasibility approval

    The utility checks the connection and the load and approves the size. We follow it up until it lands.

    The DISCOM
  3. Installation by a registered vendor

    Structure, panels, inverter, cabling, earthing and lightning protection, to the written proposal.

    Leo files
  4. Net-metering application and inspection request

    Filed with the utility once the system is installed, with the test reports.

    Leo files
  5. Inspection and the net meter

    The utility inspects the installation and installs the net meter. You are present; nothing to file.

    The DISCOM
  6. Commissioning report and the assistance

    The commissioning report goes on the portal; the assistance is released to the bank account you gave in step one.

    Leo files

The record

The firm on record

The registration

Registered with the utility

Leo Enterprises has been a registered vendor to the Telangana distribution utility for 11 KV installation and distribution since 2018. The registration is held in the parent firm's name; the certificate is shown here once the client has confirmed it in writing.