Our projects

The rooftop plants on our register.

Every solar job Leo holds: 13 handed over, 11 on site, in 10 states, placed through MES, DGD, CPWD, GeM, Private.

Illustrative image, not a Leo installation.

The record

What the works orders say.

Capacity is printed only where the works order states one, which is 12 of 24 jobs, and the totals leave out the plant we were asked to finish rather than build. They are a floor, not an estimate.

13
Plants handed over
890 kWp
Capacity on completed plants
1.42 MW
Capacity across the register
10
States worked in

Handed over

Solar plants handed over
A defence stationRooftop solar plant totalling 500 kWState: UttarakhandCapacity: 500 kWpPlaced through: MESHanded over: August 2025
AYJNISHD100 kWp grid connected rooftop plant, supplied, installed, tested and commissionedState: TelanganaCapacity: 100 kWpPlaced through: CPWDHanded over: August 2025
A works engineer's campusGrid connected rooftop plant, on grid without battery, with maintenanceState: KarnatakaCapacity: 100 kWpPlaced through: GeMHanded over: Completed
University of Hyderabad100 kW rooftop plant on the campusState: TelanganaCapacity: 100 kWpPlaced through: CPWDHanded over: Completed
A defence research campus40 kW on grid rooftop plant with solar street lighting in the residential and technical areasState: KarnatakaCapacity: 40 kWpPlaced through: MESHanded over: July 2025
A defence training establishmentTwo 20 kW solar power plants in the officers' training messState: TelanganaCapacity: 40 kWpPlaced through: MESHanded over: February 2025
A 10 kW off grid plant10 kW off grid plant with a hybrid inverter and battery storageState: TelanganaCapacity: 10 kWpPlaced through: GeMHanded over: Completed
A defence stationRooftop solar panelsState: West BengalCapacity: Not stated on the orderPlaced through: MESHanded over: Completed
A naval stationSolar panels on the parking shed around building P/150State: GoaCapacity: Not stated on the orderPlaced through: MESHanded over: April 2025
Indian Agricultural Research Institute, ShimlaSolar photovoltaic generation system with the associated electrical workState: Himachal PradeshCapacity: Not stated on the orderPlaced through: CPWDHanded over: July 2025
An air force stationRing main unit and associated solar workState: TelanganaCapacity: Not stated on the orderPlaced through: MESHanded over: December 2024
IMS and SRHQ offices, ChennaiRooftop solar power plant for both officesState: Tamil NaduCapacity: Not stated on the orderPlaced through: CPWDHanded over: Completed
An air force stationRooftop solar generation systemState: Uttar PradeshCapacity: Not stated on the orderPlaced through: MESHanded over: Completed

On site now

Solar plants under installation
SVP Cantonment General Hospital and Ravindranath Tagore School, Pune CantonmentDesign, supply, installation and commissioning of a 223 kWp rooftop plantState: MaharashtraCapacity: 223 kWpPlaced through: DGDHanded over: On site
NIEPID, Hyderabad170 kWp grid connected rooftop plant across eight blocks, hostels and the auditoriumState: TelanganaCapacity: 170 kWpPlaced through: CPWDHanded over: On site
A central security academyTraining block with a 60 kW rooftop solar generation system, fire fighting and internal electricalsState: TelanganaCapacity: 60 kWpPlaced through: PrivateHanded over: On site
Bangalore50 kWp on grid photovoltaic generation system, supplied, installed, tested and commissionedState: KarnatakaCapacity: 50 kWpPlaced through: CPWDHanded over: On site
DRI, package C930 kWp solar power plantState: TelanganaCapacity: 30 kWpPlaced through: CPWDHanded over: On site
CFMTTI, BudniSolar photovoltaic generation system, supplied, installed, tested and commissionedState: Madhya PradeshCapacity: Not stated on the orderPlaced through: CPWDHanded over: On site
CCA office, BangaloreOn grid rooftop photovoltaic systemState: KarnatakaCapacity: Not stated on the orderPlaced through: CPWDHanded over: On site
A military stationRooftop solar of different capacities, without battery, on two buildingsState: UttarakhandCapacity: Not stated on the orderPlaced through: MESHanded over: On site
BangaloreGrid connected rooftop solar plant with maintenanceState: KarnatakaCapacity: Not stated on the orderPlaced through: GeMHanded over: On site
An army centreCompleting the incomplete works of a 2 MW solar power plantState: TelanganaCapacity: 2 MWPlaced through: MESHanded over: On site
An air force stationSolar power generation with three years of maintenanceState: MaharashtraCapacity: Not stated on the orderPlaced through: MESHanded over: On site

After handover

5 of these plants are under a maintenance contract with us

The same engineers who installed them hold the operation and maintenance contracts, from one to three years, including the 500 kW plant in Uttarakhand. Ask for maintenance on your own plant at survey stage.

  • A defence station

    3 years of maintenance, Uttarakhand

  • A defence station

    1 year of maintenance, West Bengal

  • An air force station

    1 year of maintenance, Uttar Pradesh

  • An army centre

    3 years of maintenance, Telangana

  • An air force station

    3 years of maintenance, Maharashtra

How to read this list

  • Each row is a works order on Leo Enterprises's project register of September 2026.
  • Capacity is the figure on the order. Where the order does not state one, the row says so.
  • The month is the one the register records against handover; jobs still on site say so.
  • The one job to finish a plant another contractor began (An army centre, 2 MW) is listed but not counted into the installed totals.
  • What a job was worth, what it cost and who signed it stay off this site, and always will.