Andhra Pradesh Grid Interconnection

APEPDCL Net-Metering & Solar Interconnection Guide

Technical feasibility norms, voltage thresholds, bi-directional metering specifications, and utility liaison for rooftop solar under Eastern Power Distribution Company of Andhra Pradesh Limited.

State: Andhra PradeshHQ: P&T ColonyOfficial Solar Portal

Distribution Utility Profile

APEPDCL

Eastern Power Distribution Company of Andhra Pradesh Limited

Regulatory Commission
APERC (Andhra Pradesh Electricity Regulatory Commission)
Corporate Headquarters
P&T Colony, Seethammadhara, Visakhapatnam, Andhra Pradesh 530013
Official Consumer Portal
APEPDCL Corporate and Solar Portal

Operational Jurisdiction

11 Districts Covered

Grid-connected solar net-metering applications and MRT meter testing for all administrative revenue circles in these districts are processed through APEPDCL divisions:

VisakhapatnamAnakapalliAlluri Sitharama RajuVizianagaramParvathipuram ManyamSrikakulamKakinadaEast GodavariDr. B.R. Ambedkar KonaseemaWest GodavariEluru

Key Urban Centers

Visakhapatnam, Rajahmundry, Kakinada, Vizianagaram, Srikakulam, Eluru

Technical Feasibility & Specs

Interconnection norms & thresholds

Statutory supply voltages, transformer capacity ceiling, and bi-directional meter specifications applicable for solar rooftop connections under APEPDCL.

01Voltage Limits

Supply Voltage Thresholds

Permissible interconnection supply levels based on total solar inverter AC output capacity:

LT Single-Phase
Up to 3 kW (single-phase 230V, extendable to 5 kW based on service line)
LT Three-Phase
Above 5 kW up to 56 kW (415V three-phase LT supply)
HT 11 kV Supply
Above 56 kW up to 1,000 kW (11 kV HT supply)
HT 33 kV Supply
Above 1,000 kW up to 5,000 kW (33 kV HT supply)

Supply conversion application can be bundled with solar feasibility filing.

02Feasibility Norms

Transformer & Load Caps

Statutory limits enforced by regulatory orders during technical scrutiny:

DTR Capacity Ceiling: 100%
Cumulative solar capacity on distribution transformers is permitted up to 100% of rated capacity under APERC Solar Rooftop Regulations.
Contracted Load Limit: Up to 100%
Consumers across residential, commercial, and institutional categories can install up to 100% of contracted load, subject to a 500 kWp net-metering ceiling.
Settlement Cycle
Monthly energy netting with credit carry forward across billing cycles
Banking Carry-Forward
Annual settlement period with surplus unutilized credits adjusted as per APERC tariff orders

Feasibility approval is valid for project execution and agreement signing.

03Meter Standards

Bi-Directional Net-Meter

Utility hardware specifications and calibration protocols:

Bi-Directional Net Meter
DLMS-compliant bidirectional four-quadrant static meter (Class 1.0 for LT, Class 0.5s for HT) complying with IS 13779 / IS 14697 and APERC technical standards
Solar Generation Meter
Unidirectional solar generation check meter installed at inverter AC output
Protocol Compliance
DLMS / COSEM protocol compliant with optical communication port
Testing Laboratory
APEPDCL Meter Relay Testing (MRT) Laboratory

Leo Solar handles procurement, lab testing delivery, and installation liaison.

Step-by-Step Workflow

4-Step Interconnection Timeline

From initial feasibility registration on the portal to grid synchronization and commissioning certificate release with APEPDCL.

0110 to 15 working days

Feasibility Application and Engineering Drawings Submission

Submission of online application on the APEPDCL solar portal or PM Surya Ghar portal using Service Connection Number (SCNO), accompanied by the 5 mandatory engineering drawings (SLD, GA layout, Earthing scheme, Net Metering schematic, Structural stability certificate).

ResponsibilityApplicant and APEPDCL Operation Division
023 to 5 working days

Technical Feasibility Clearance and Agreement Execution

Technical clearance issued by APEPDCL ADE (Operation) following transformer headroom review, followed by execution of the APERC standard Net Metering Interconnection Agreement.

ResponsibilityApplicant and APEPDCL Divisional Engineer
037 to 14 working days

Plant Erection and MRT Meter Testing

Installation of rooftop solar plant with marine-grade hot-dip galvanized mounting structures. Delivery of meters to APEPDCL MRT laboratory for calibration, accuracy check, and official sealing.

ResponsibilityLeo Solar and APEPDCL MRT Division
045 to 7 working days

Site Inspection, Anti-Islanding Verification, and Synchronization

On-site verification by APEPDCL ADE (Operation), execution of anti-islanding functional test, installation of sealed bi-directional meter and solar generation meter, and release of formal Commissioning Certificate.

ResponsibilityAPEPDCL ADE (Operation) and Leo Solar

Regulatory & Technical Guidance

Frequently asked questions for APEPDCL

Clear answers to common questions regarding distribution transformer headroom, billing adjustment, meter testing, and safety norms.

What are the five engineering drawings required by APEPDCL?

APEPDCL mandates five technical drawings: a Single Line Diagram (SLD), a General Arrangement (GA) array layout, an Earthing scheme layout, a Net Metering schematic, and a Structural Stability Certificate from a certified structural engineer.

What is the DTR capacity limit under APERC regulations for APEPDCL?

Under APERC regulations, cumulative solar capacity is allowed up to 100% of the distribution transformer rated capacity. APEPDCL regularly updates transformer headroom status on its consumer dashboard.

What hardware precautions are essential for solar installations in coastal APEPDCL districts?

Visakhapatnam, Kakinada, and coastal districts experience saline sea air. Structural mountings must use hot-dip galvanized steel (80 to 120 microns) or anodized aluminium, paired with SS304/SS316 fasteners and IP65/IP66 enclosures to prevent corrosion.

What is the maximum system size eligible for net-metering under APEPDCL?

Under APERC regulations, net-metering is available for systems up to 500 kWp per service connection. Systems above 500 kWp up to 5,000 kWp are accommodated under gross metering or open access frameworks.

How does APEPDCL handle excess energy credit settlement?

Surplus energy fed into the grid is credited against consumed energy in each billing cycle. Unutilized credits are carried forward to subsequent billing cycles within the annual settlement cycle as per APERC tariff orders.

Full Liaison Included

Ready to connect solar to APEPDCL?

Leo Solar handles your roof survey, structural design, online portal registration, MRT laboratory testing, and physical bi-directional meter synchronization with Eastern Power Distribution Company of Andhra Pradesh Limited.

Calculate Solar Savings & SubsidyChat on WhatsApp for Feasibility

Direct consultation with our Telangana & Andhra Pradesh utility engineering team.