TGNPDCL Net-Metering & Solar Interconnection Guide

Technical feasibility norms, voltage thresholds, bi-directional metering specifications, and utility liaison for rooftop solar under Northern Power Distribution Company of Telangana Limited.

State: TelanganaHQ: Vidyut BhavanOfficial Solar Portal

Distribution Utility Profile

TGNPDCL

Northern Power Distribution Company of Telangana Limited

Regulatory Commission
TGERC (Telangana State Electricity Regulatory Commission)
Corporate Headquarters
Vidyut Bhavan, Nakkalagutta, Hanumakonda, Warangal, Telangana 506001
Official Consumer Portal
TGNPDCL Official Portal

Operational Jurisdiction

18 Districts Covered

Grid-connected solar net-metering applications and MRT meter testing for all administrative revenue circles in these districts are processed through TGNPDCL divisions:

WarangalHanumakondaJangaonJayashankar BhupalpallyMahabubabadMuluguKarimnagarJagtialPeddapalliRajanna SircillaKhammamBhadradri KothagudemNizamabadKamareddyAdilabadMancherialNirmalKumuram Bheem Asifabad

Key Urban Centers

Warangal, Hanumakonda, Karimnagar, Nizamabad, Khammam, Ramagundam, Adilabad

Technical Feasibility & Specs

Interconnection norms & thresholds

Statutory supply voltages, transformer capacity ceiling, and bi-directional meter specifications applicable for solar rooftop connections under TGNPDCL.

01Voltage Limits

Supply Voltage Thresholds

Permissible interconnection supply levels based on total solar inverter AC output capacity:

LT Single-Phase
Up to 5 kW (230V single-phase LT supply)
LT Three-Phase
Above 5 kW up to 56 kW (415V three-phase LT supply)
HT 11 kV Supply
Above 56 kW up to 1,000 kW (11 kV HT supply)
HT 33 kV Supply
Above 1,000 kW up to 5,000 kW (33 kV HT supply)

Supply conversion application can be bundled with solar feasibility filing.

02Feasibility Norms

Transformer & Load Caps

Statutory limits enforced by regulatory orders during technical scrutiny:

DTR Capacity Ceiling: 50%
Cumulative solar generation capacity on any distribution transformer cannot exceed 50% of the transformer rated capacity under TSERC Regulation 6 of 2016.
Contracted Load Limit: Up to 100%
Residential consumers may connect up to 100% of sanctioned load; commercial and industrial connections are capped at 80% of sanctioned load.
Settlement Cycle
Monthly net billing adjustment against retail tariff slabs
Banking Carry-Forward
Surplus energy credits carry forward across monthly billing cycles within the annual settlement period defined by TGERC tariff orders

Feasibility approval is valid for project execution and agreement signing.

03Meter Standards

Bi-Directional Net-Meter

Utility hardware specifications and calibration protocols:

Bi-Directional Net Meter
DLMS-compliant four-quadrant static bi-directional energy meter (Class 1.0 for LT, Class 0.5s for HT) conforming to IS 13779 / IS 14697 and CEA metering guidelines
Solar Generation Meter
Unidirectional static generation check meter installed on the inverter AC output
Protocol Compliance
DLMS / COSEM protocol compliant with optical communication port
Testing Laboratory
TGNPDCL Meter Relay Testing (MRT) Laboratory

Leo Solar handles procurement, lab testing delivery, and installation liaison.

Step-by-Step Workflow

4-Step Interconnection Timeline

From initial feasibility registration on the portal to grid synchronization and commissioning certificate release with TGNPDCL.

0110 to 15 working days

Online Application and Feasibility Verification

Registration on the TGNPDCL Solar Portal or PM Surya Ghar National Portal using USCNO. Local Assistant Divisional Engineer (Operation) assesses distribution transformer capacity and 11 kV feeder loading.

ResponsibilityApplicant and TGNPDCL Operation Division
023 to 5 working days

Feasibility Clearance and Agreement Execution

Receipt of formal technical feasibility sanction followed by execution of the standard Net Metering Interconnection Agreement with the TGNPDCL Divisional Engineer.

ResponsibilityApplicant and TGNPDCL Divisional Engineer
037 to 14 working days

Installation and MRT Meter Testing

Turnkey rooftop installation including dedicated chemical earthing pits and surge protection. Delivery of meters to TGNPDCL MRT testing laboratory for bench calibration and official sealing.

ResponsibilityLeo Solar and TGNPDCL MRT Division
045 to 7 working days

Field Inspection, Grid Synchronization, and Commissioning

On-site technical inspection by TGNPDCL field engineers, verification of anti-islanding trip relay and earthing resistance (under 5 ohms), installation of sealed bi-directional meter, and issuance of Commissioning Certificate.

ResponsibilityTGNPDCL ADE (Operation) and Leo Solar

Regulatory & Technical Guidance

Frequently asked questions for TGNPDCL

Clear answers to common questions regarding distribution transformer headroom, billing adjustment, meter testing, and safety norms.

Can commercial establishments or agro-processing units in TGNPDCL apply for net-metering?

Yes. Commercial and industrial units under TGNPDCL can install grid-tied solar up to 80% of their sanctioned load under net-metering, subject to technical feasibility on the supplying 11 kV feeder or distribution transformer.

How does TGNPDCL calculate the 50% DTR capacity ceiling?

TGNPDCL monitors cumulative solar injection on each distribution transformer. Total installed rooftop solar capacity cannot exceed 50% of the transformer rated kVA. If the ceiling is reached, feasibility is deferred until the transformer is upgraded or capacity becomes available.

What earthing specifications are required by TGNPDCL for solar installations?

TGNPDCL mandates separate, dedicated chemical earthing pits for DC surge protection, solar module mounting structure frames, and inverter AC earth, with total earth resistance tested below 5 ohms.

How does net-metered billing reflect on the TGNPDCL consumer portal?

The monthly spot-billing system or smart meter logs import kWh, export kWh, and net kWh. The consumer portal and monthly bill itemize imported units, exported units, and carried-forward banked units.

Does TGNPDCL support three-phase conversion for solar rooftop installations?

Yes. If a single-phase consumer wishes to install a solar plant larger than 5 kW, they can apply for a single-phase to three-phase service conversion with TGNPDCL simultaneously with their solar feasibility request.

Full Liaison Included

Ready to connect solar to TGNPDCL?

Leo Solar handles your roof survey, structural design, online portal registration, MRT laboratory testing, and physical bi-directional meter synchronization with Northern Power Distribution Company of Telangana Limited.